TEMPORARY POWER SOLUTION FOR HEALTHCARE INDUSTRY 

INSTALLED EQUIPMENT: The installation delivers 1 MW of power at 15 kV, sufficient to cover all temporary power needs during the construction and commissioning phases.

CLIENT: Healthcare industry.

 

HES has developed and implemented a temporary power solution that ensures start-up power and bridging energy supply for an industrial plant. This facility will become the company’s largest industrial unit in Europe. This strategic project accelerates the construction phase and reliability of the process but also lays the groundwork for the future operation of the factory, which will produce essential medical devices for thousands of patients worldwide. Through this turnkey proposal combining power generation, fuel management, and comprehensive service, HES supports the healthcare company's goal of meeting the growing international demand for its medical devices. 

 

CONTINUOUS POWER AND RAPID RESPONSE 

HES provided its client in the healthcare sector with an immediate power supply solution for the construction of its manufacturing plant, offering a fully customised service. The ultra-fast mobilization of equipment was another key highlight of the project, ensuring critical, uninterrupted power so that construction could proceed safely and efficiently. 

 

POWER CHALLENGES

The installation presented several energy challengesrequiring a “bridging” power solution capable of meeting multiple critical needs. 

1

ENSURING POWER

A key aspect was ensuring sufficient power during the construction and commisioning phases, so that all equipment and processes could operate without interruptions.

2

SAFETY & RELIABILITY

In addition, the facility needed a safe and reliable power supply until the new transformer became fully operationalminimizing the risk of project delays or interruptions in the construction schedule. 


3

TURNKEY SERVICE

Finally, a comprehensive fuel management and turnkey service system was requiredThis ensured efficient fuel supply control, continuous monitoring of generator performance, and rapid response capabilitiesproviding reliability and peace of mind throughout the construction phase.  

COMPREHENSIVE GENERATOR MANAGEMENT

STABLE POWER FOR SENSITIVE EQUIPMENT

The plant under construction belongs to the healthcare sector and will be dedicated to the production of medical devices. HES’s solution was specifically designed for this project, providing energy and full generator management to ensure the progress of construction while providing stable power required for sensitive equipment used in the manufacture of healthcare products. 

HES – HIMOINSA Energy Services – has carried out a comprehensive turnkey plant project. The installation delivers 1 MW of power at 15 kV, sufficient to cover all temporary power needs during the construction and commissioning phases. 

In addition, HES provides full service and fuel management, including continuous monitoring, efficient refueling, and preventive maintenance of the equipment, thus ensuring constant power availability. 

The solution includes state-of-the-art generators configured to meet the start-up and temporary operational power demands of the plant. This integrated proposal allows project managers to focus entirely on construction while HES takes care of the entire temporary energy infrastructure.  

CONCLUSION

The project developed by HES ensures a reliable start-up guaranteeing continuous energy during this critical construction and commissioning phase. The new factory will strengthen the company's production capacity, creating jobs and contributing to the company's sustainability and international expansion strategy. 

CURIOUS TO LEARN MORE?

Himoinsa Porto-017

WATCH VIDEO

THUMBNAIL-PDF

DOWNLOAD